I am using Baan LN. In Baan IV I could add 100% overlap on routing operations. I'm trying to do the same in LN, but can't figure it out.
I want all operations to have the same start time.
I was trying to use parallel operations in Baan LN, but I need help.
I want all operations to have the same start time.
I was trying to use parallel operations in Baan LN, but I need help.