Completion of bom with "Generate Order Planning (cprrp1210m000)"

$
0
0
Hello,
we're using PCS and have a manufacturing item which has for e. g. a depth of 10 bom levels, including phantom items on different bom level.

When we insert this item in the bom of an other item, the bom of the insertet item is not expandet completely (that is correct so far).

After inserting the item, we use the session "generate order planning (cprrp1210m000)" to complete the bom structure and to generate different order types.

BUT: For some phantom items in the bom structure (depth of 10 level) the bom is not expandet (= derived from the standard item) so the bom remains empty.

Does anybody have an idea, why the system behaves like this?

Regards